Wednesday, April 15, 2009

Day 7











Here are the photos from day seven. The work that I found completed was they finished tiling the walls in the shower. They also made the step into the shower slop towards the shower so water will run off it into the shower. They also smoothed out the surface around the tub and installed the first row of tile. They also filed in and converted the old wall heater into a GFI outlet. There is still a lot of work to be done. They just have to tile the shower door jamb, tile the shower floor, and put the 1/4 round trim around the top of the shower. They also have to finish the tiling around the shower by adding a row of glass followed by 1 more row of tile and the 1/4 round for that. They also have to finish smoothing around the outside of the shower, tile the bathroom floor including all of the prep work for that. All the plumbing fixtures need to be installed, wiring for the lamp fixture needs to be updated, and the switches for all the different lights and fans to be installed. Additionally they need to install the trim work for the recessed lighting and install the lights. Finally, they need to do all the grout work. I hope they can get it all done by Friday night so the Mrs. and the kid can move back home on Saturday. It is all in Gods hands now. Thanks for all of your support.

No comments:

Post a Comment